Kingsville News

Essex County Construction and Road Closures Updated July 30, 2021

UPDATED July 30, 2021

County Road 27 will be closed (bridge out) between County Road 8 and County Road 46 from May 17 to Aug. 13 for bridge rehabilitation. (Map ID#1)

County Road 22 will have lane restrictions in both directions between County Road 21 and Commercial Boulevard from Aug. 3 to Aug. 11 for road construction. (Map ID#2)

County Road 17 will be closed at the Sullivan Creek, between Highway 401 and County Road 46, from July 19 to Aug. 13 for culvert replacement. The detour starts at the County Road 42 and Lauzon Parkway intersection. (Map ID#3)

County Road 20 will have lane restrictions between County Road 50 and Front Road South from June 25 to July 30. (Map ID#4)

County Road 27 will be closed at No. 47 Drain, between County Road 23 and Highway 3, from Aug. 4 to Sept. 3 for culvert replacement. (Map ID#5)***

County Road 42 will be closed at the Concession 4 Drain, between Renaud Line and County Road 25, from Aug. 16 to Sept. 10. (Map ID#6)

County Road 2 will have lane restrictions between Strong Road and Moisson Creek Bridge from July 26 to Aug. 13 for road construction. (Map ID#7)

County Road 23 will have lane restrictions between County Road 18 and County Road 27 from July 26 to Aug. 13 for road construction. (Map ID#8)

County Road 20 will have lane restrictions between Roseborough and County Road 41 from July 28 to Aug. 13 for road construction. (Map ID#9)

Please exercise patience with the line painting operations. Be prepared to drive slowly and do not drive over the wet paint to prevent damage to your vehicle.

***The road closure start date for County Road 27 at the No. 47 Drain was updated to Aug. 4 after this was first posted.

Read this article on our website.

 

Leave a Comment

Your email address will not be published. Required fields are marked *

*